Bathroom renovation glossary

Plain definitions of bathroom renovation terms, from first fix to snagging, with what each is called in the US, UK, Canada, Australia and New Zealand.

Allowance

Also: Provisional sum

A budget in the price for something the homeowner chooses later, such as a vanity or tiles. If their choice costs more or less, the difference is agreed separately.
Backer board

Also: Cement board, tile backer

A water-resistant board fixed to the walls of a shower or bath area to tile onto, instead of plasterboard or drywall.
Bathroom Passport
A permanent digital record of a finished bathroom: every product, manual, warranty, care note and photo, kept by the homeowner and passed on when the home is sold.
Cooling-off period

Also: Right to cancel, cancellation period

The time a homeowner has to cancel a contract agreed at their home or online, without giving a reason. The length depends on the country.
Curbless shower

Also: Level-access shower, wet room

A shower with no step or tray edge, so the floor runs level into the shower area. Needs careful falls and waterproofing.
Deposit and stage payments

Also: Progress payments, interim payments

A payment to book the work, then payments tied to stages of the job, with the last at handover.
Extractor Fan

Also: Exhaust Fan

The fan that removes steam and moisture from the bathroom. It should vent outside, not into a loft or attic.
First Fix

Also: Rough-In

The stage when pipes, drains and wiring are run inside walls and floors, before the walls are closed and tiled.
GFCI

Also: RCD (UK, Ireland, Australia, New Zealand)

A safety device that cuts power instantly if it detects current leaking to earth, required for bathroom circuits.
Handover

Also: Closeout, completion

The end of the job: the final walkthrough, closing the list of faults, and giving the homeowner manuals, warranties and care details.
Lead time
How long a product takes to arrive once ordered. Long lead times decide when products must be ordered to keep the job on schedule.
Quote

Also: Proposal

The priced offer for the work, often with options at different prices. Once accepted and signed it forms the contract.
Second fix

Also: Trim-out (US)

The finishing stage of plumbing and electrics: fitting taps, toilets, lights and switches once surfaces are done.
Selections

Also: Choices, specification

The products and finishes the homeowner chooses for their room, often from options the business presents.
Snagging

Also: Punch List, Defects List, Deficiency List

The list of small faults and unfinished items found at the end of a job, fixed before handover and the final payment.
Survey

Also: Site visit

The visit to measure the room, check its condition and understand what the homeowner wants, before pricing the job.
Tanking

Also: Waterproofing

A membrane or coating applied to walls and floors in wet areas so water cannot reach the structure behind the tiles.
Variation

Also: Change Order

A written change to the agreed work, with its price and any change to the finish date, agreed by the homeowner before the work is done.