Free template
Bathroom handover checklist
Finish and hand over a bathroom properly: products, manuals, warranties, care, the snag list and the walkthrough, in one printable checklist.
Before handover
- Installed products confirmed
- Manuals uploaded
- Warranties recorded
- Before and after photos uploaded
- Care and maintenance information confirmed
- Snag List closed out
- Client walkthrough completed
- Bathroom Passport issued
What to give the client
- Manuals and warranty details for every product
- Product names, finishes and where they were bought
- Grout, sealant and paint colours and codes
- Where the water shut-off and isolation valves are
- Care and cleaning guidance for each surface
- Spare tiles from the same batch
- Certificates and inspection sign-offs, where required
- How to report a problem after handover
A good handover answers the questions a client will have in five years: what grout did we use, who made the tap, when does the warranty run out. Put it in writing, in one place, before the final payment.
In Bathroom Passport
Hand over a Bathroom Passport
Questions
Good to know.
What should a bathroom handover include?
Confirmed products with manuals and warranties, before and after photos, care and maintenance guidance, a closed snag list and a walkthrough with the client.
Why record grout and sealant colours?
Repairs years later are much easier when the exact colour and product are known. It is one of the most common questions homeowners ask after a renovation.
Start today
Give every bathroom the finish it deserves.
Try everything free for 14 days, no card needed. Set up your first bathroom renovation in minutes.
Prefer a walkthrough? Book a demo